Wessex Water, Allington Reservoir

Description

Subcontracting to Wessex Waters own in-house construction team (WECS Civils), Bartlett Contractors Ltd carried out all pipe laying and land reinstatement works including large connections on the existing 600mm mains 5 metres and deep back filling of the new reservoir plus all hard and soft landscaping

Wessex Water Snowsdown to Littledown 21Km Pipeline

 

Description

Installation of 21 Km of 500/600mm Ductile Iron

Bartlett Contractors Ltd were appointed Principal Contractor to deliver this large section of pipeline said to be the largest length of pipeline let by Wessex Water for the grid scheme AMP6 so far.

This also included many land owner constraints and enabling works at the proposed Pimperne pump station site where WECS Civils will carry out the construction.

 

Festival Republic, Reading Festival Ground

 

Description

Installation of sewer attenuation tanks, pumping mains, gravity sewer pipes and manholes and large culvert crossing.
General reinstatement works such as reseeding and topsoiling. Strengthened and extended a river crossing.